Functional Program

Содержание

Слайд 2

MILANO PORTA ROMANA FROM a temporary Olympic Village TO an urban

MILANO
PORTA ROMANA

FROM a temporary Olympic Village
TO an urban Student Housing
A

new Vision and an innovative Program
for Milano Porta Romana Railway Yard
Слайд 3

STEP 1 TACTICAL / STRATEGIC PROCESS INNOVATIVE VISION FOR THE URBAN

STEP 1
TACTICAL /
STRATEGIC
PROCESS
INNOVATIVE VISION FOR THE URBAN LANDSCAPE
AIM
Designing a

new structure/urban layout for Porta Romana area in Milano focusing on dispositive figures
EXPECTED RESULT
New system of urban connections and relations
Masterplan

STEP 2
DESIGN FOR TEMPORARY
FUNCTIONS
THE 2026 MILANO OLYMPIC VILLAGE
AIM
Designing temporary housing and support services, uses and functions for the Olympic Village of 2026 Winter Games
EXPECTED RESULT
Location of spaces and places in the area
Integration with park

STEP 3
DESIGN FOR A NEW DISTRICT
STUDENTS HOUSING COMPLEX IN THE CITY
AIM
Transforming the Olympic Village system into a new district oriented to host students with urban functions
EXPECTED RESULT
Architectural design of the housing
Details: materials, lights and colours

Слайд 4

Urban Olympic Village and Headquarter A topical driver for the regeneration

Urban Olympic Village
and Headquarter

A topical driver for the regeneration is

the 2026 Winter Olympic Games. It will be a spread edition of the Games, from the city to the Alps. Milano Porta Romana is appointed to become its focal point with one of the Olympic Temporary Village, main headquarter and reference point.
2
Слайд 5

INNOVATIVE IDENTITY A NEW URBAN PARK TEMPORARY USE OLYMPIC VILLAGE LONG-TIME

INNOVATIVE IDENTITY
A NEW URBAN PARK
TEMPORARY USE
OLYMPIC VILLAGE
LONG-TIME TRANSFORMATION
STUDENTS CAMPUS

1
2
3

2020

2026

2030

Слайд 6

A new large-urban-scale vision for the city. Park and nature are

A new large-urban-scale vision for the city. Park and nature are

intended as the backdrop for any new urban transformation.
Ref: Mecanoo vision for Milano Railway Yards

1
2
3

A VISION:

Слайд 7

Ref: Stefano Boeri vision for Scalo Farini

Ref: Stefano Boeri vision for Scalo Farini

Слайд 8

From a gated enclave to…

From a gated enclave to…

Слайд 9

From a gated enclave to…a regenerated collective space with a renovated

From a gated enclave to…a regenerated collective space with a renovated

balance among natural and artificial

Some references: urban parks

Porta Nuova Milano

Слайд 10

INTERPRETATIVE DIAGRAM Sector B_35.000 sqm ADDITION Sector A_180.000 sqm CORE AREA

INTERPRETATIVE DIAGRAM

Sector B_35.000 sqm
ADDITION

Sector A_180.000 sqm
CORE AREA

Sector C_ more than 1.000.000

sqm
ECO LINEAR PARK
Слайд 11

INTERPRETATIVE DIAGRAM Sector B_35.000 sqm ADDITION Sector A_180.000 sqm CORE AREA

INTERPRETATIVE DIAGRAM

Sector B_35.000 sqm
ADDITION

Sector A_180.000 sqm
CORE AREA

Sector C_ more than 1.000.000

sqm
ECO LINEAR PARK

A new urban park, with a west-east main direction: beyond the fences, connecting existing parks, gardens and collective spaces, as well as streets and roads

Слайд 12

TOPIC What is a contemporary urban park? At least 80% of

TOPIC
What is a contemporary urban park?

At least 80% of the
surface

has to be «green»:
NATURAL AREAS
ECOLOGICAL CORRIDORS
PATHWAYS
CYCLE ROUTES
SUSTAINABILE INFRASTRUCTURES
COLLECTIVE SPACES
NEW FORMS OF AGRICULTURES

Structure of the regenerated area has to be its own large-scale park.
Design of large intervals of collective spaces and shared places, through new paths, squares and parks. Grafting on different types of nature and green, with a collective vocation and multiple connections. Building of sequences of lines, directions and walls – also interfering and interacting with the soil – not as barriers but as new diaphragms orienting gazes and movements. Defining multiple hierachies of permeability and porosity through a new system of light and sustainable accessibility.

Слайд 13

From a no-mans-land to…

From a no-mans-land to…

Слайд 14

to…a Temporary Village, temporary home for Olympic athlethes with structure and

to…a Temporary Village, temporary home for Olympic athlethes with structure and

infrastructures

Some references: Olympic Villages

London 2016

Tokyo 2020

Paris 2024

Oslo 1952

Слайд 15

TOPIC What is a Temporary Olympic Village within a large-scale urban

TOPIC
What is a Temporary Olympic Village
within a large-scale urban park?


The area will host special housing for:
1.500 athletes
in single and double rooms
With services/infrastructures/public areas
Dining rooms, bars, restaurants
Shops, collective areas, meeting spaces
Auditorium, cinemas, media area

HORIZON 2026

50% HOUSING
-
50% SERVICES

60.000 sqm

Слайд 16

The post-2026 Winter Olympic Games will see a shift from temporariness

The post-2026 Winter Olympic Games will see a shift from temporariness

to a long-time urban transformation.
Focus is the special housing for students.
In Milano there are almost 200.000 university students , 70.000 of them are non-residents.
3
Слайд 17

From the Olympic Village to…

From the Olympic Village to…

Слайд 18

From the Olympic Village to…an innovative Student Housing Campus with services

From the Olympic Village to…an innovative Student Housing Campus with services

and infrastructures

Some references: Student Housing

Lucien Cornil, Marsiglia, 2018

Bicocca, Milano, 2018

Bocconi, Sejima, Milano 2019