Contractors’ admission to the sites of SLK Cement OOO

Слайд 2

Contractors’ admission to the sites of SLK Cement OOO carried out

Contractors’ admission to the sites of SLK Cement OOO carried out

in 4 stages

SLK Cement OOO

Contractor

1. Before work

Contractors shall be picked in accordance with the bidding procedure
Concluding a contract
Induction training;

Provides:
Сopies of documents the HSE;
Familiarization of employees with the HSE;
To develop the Work Execution Plan (WEP);
To develop a Risk Identification, Assessment and Management Card before works

2. Preparation for work

Assigned The Work Supervisor;
Hold a kickoff meeting;
Prepare an Operations Certificate;
Agrees upon the Work Permit by types of work;

Provides:
The company’s orders on the appointment of persons responsible for the safe operation;
The company’s order on the persons authorized to execute Operations Certificates and Work Permits;
Draws up a form "Identification of hazards"

Слайд 3

3. Work Assessment of the condition of the site / places

3. Work

Assessment of the condition of the site / places of

work;
Daily monitoring of compliance with the requirements of HSE, fire safety;
For violations of the requirements, an Act is drawn up, work is stopped until the remark is eliminated.

Daily briefings;
Use PPE;
Have in the presence of serviceable equipment;
Keep logs on inspection of equipment, equipment;
Keep a register of briefings at the workplace;
Provide periodic medical examinations for drivers.

Fills out the contractor assessment protocol;
This puts a rating.

4. After work

In case of violation of the rules (labor protection, traffic), the driver opens the coupon from the booklet, in case of repeated violation, the second coupon opens and the driver is prohibited from entering the territory of the Customer for two months;

SLK Cement OOO

The Contractor must provide

Слайд 4

On the results of the UMM employee incident investigation 29.10.2019 held

On the results of the UMM employee incident investigation 29.10.2019 held

the events

1. The master contractor is suspended from his duties

8. Potentially dangerous works carried out on a day shift in the presence of the Director General or the Chief Engineer or the site manager of “Sukholozhskcemremont” OOO

3. For contractors trained on hazards identification and risk assessment

6. In WEP the section on actions of workers in an emergency is adjusted

4. The workplace has strengthened control the 2nd stage of OS at the contractor

7. When scheduling repairs, plan the start of potentially hazardous work on a day shift

9. An order was approved and amendments were made to the service station on the mandatory use of the chin strap on the helmet when performing work

10. A labor safety committee created quarterly for contractors

2. An unscheduled briefing on work in a confined space was conducted and training was conducted

5. When carrying out repairs at the VP № 1, organized daily monitoring of the Occupational Safety, Industrial Safety, Fire Safety

Слайд 5

The coronavirus situation

The coronavirus situation

Слайд 6

Actions at plants

Actions at plants

Слайд 7

Actions at plants

Actions at plants

Слайд 8

Actions at plants

Actions at plants

Слайд 9

Actions at plants

Actions at plants