- 2. C6.6/1106D Rail Pressure Instability CPI Issue 157582 Status - Open, Active PCA was planned for production
- 3. C6.6/1106D New Media Fuel Filter rework Rollout V211 option & V611 special instruction for UGM have
- 4. 400 Series oil pressure slow to rise. CPI Project 173720 BB A. Hawkes Project scope being
- 5. Current data shows only isolated cases. Oil drain back from the system / oil filter is
- 6. 3024C Oil dripping from breather New machine 226B SSL reported as dripping oil from open breather
- 7. C4.4 / C6.6 / 1104D / 1106D Injectors not responding. The applications operating mode will not
- 8. 3024C/400 Series Head Gasket All Peterborough built HR lists now have full production gasket used in
- 9. Summary 400C turbo testing completion 10/08/07 400C NA test work for MLS planned completion 31/08/07 (test
- 10. 1104/6D - C4.4/C6.6 Injector fuel leak. CPI Project No.173606: BB Dave Cook.
- 11. Injector cracking