- 2. D1. 组建团队 Page Task Force
- 3. D2. 問題描述 Page
- 4. D3. 实施并验证临时或围堵措施 Page 1.客戶端庫存品:0PCS 2.在途品:0PCS 3.廠內庫存品:0PCS Containment Action 立即\阻截措施 Perform the activity to reduce the possible
- 5. D4. 确定并验证根本原因 Page Define/Verify Cause 原因分析 How was failure detected? What’s the root cause (Break down
- 6. Page D5. 选择和验证永久纠正措施 Corrective Action 改善對策 Describe who, what, when and how you will implement change
- 7. Page D5. 选择和验证永久纠正措施 Corrective Action 改善對策 Describe who, what, when and how you will implement change
- 8. Page D6. 实施永久纠正措施 Verify Effectiveness of Action 措施效果验证及追踪 Describe verification results in quantifiable terms. Show evidence
- 10. Скачать презентацию
D1. 组建团队
Page
Task Force
D1. 组建团队
Page
Task Force
D2. 問題描述
Page
D2. 問題描述
Page
D3. 实施并验证临时或围堵措施
Page
1.客戶端庫存品:0PCS
2.在途品:0PCS
3.廠內庫存品:0PCS
Containment Action 立即\阻截措施
Perform the
D3. 实施并验证临时或围堵措施
Page
1.客戶端庫存品:0PCS
2.在途品:0PCS
3.廠內庫存品:0PCS
Containment Action 立即\阻截措施
Perform the
D4. 确定并验证根本原因
Page
Define/Verify Cause 原因分析
How was failure detected? What’s the
D4. 确定并验证根本原因
Page
Define/Verify Cause 原因分析
How was failure detected? What’s the
>>客戶反饋詳細如下:
>>針對客戶反饋的冷焊不良,宣導生產生管各相關主管分析討論,對焊接工站進行排查,結果如下:
1. Operator is not so good skilled need to training
2. Operator pull or remove wire during soldering
3. Solder head, leave too much tin without clean
4. Although testing voice pass well, but cold sold cause parts wire remove during transpotation
Page
D5. 选择和验证永久纠正措施
Corrective Action 改善對策
Describe who, what, when and how
Page
D5. 选择和验证永久纠正措施
Corrective Action 改善對策
Describe who, what, when and how
>Corrective action:
In connection with cold soldering, the following are the qualities control of non-wetting:
:
-----Dpt/PD 段賢 2019/07/05
>1:Check the soldering bit and the wire in the beginning, as soldering wire, bare wire of the connector must solder into tin. It should stay for 2S when finish one side, while the other side become cold than solder it. To do this is to prevent one side not cold enough and to affect the connection of the solder. After soldering, put the speaker on the tooling (do not hold the wire) then to work on the flowline.
Page
D5. 选择和验证永久纠正措施
Corrective Action 改善對策
Describe who, what, when and how
Page
D5. 选择和验证永久纠正措施
Corrective Action 改善對策
Describe who, what, when and how
>Corrective action:
-----Dpt/PD 段賢 2019/07/05
>2:Enhance the quality check rate of the soldering bit, IPQC should check the appearance per hour. Temperature QC notice: It cannot overlap the speaker while soldering, and have to clean the solder bit every 5 times, can’t work it immediately, must wait for the temperature light shows and to work.
>3:Educate the operating staff, managers should train them and ask the staff to obtain the certificate.
Page
D6. 实施永久纠正措施
Verify Effectiveness of Action 措施效果验证及追踪
Describe verification results in
Page
D6. 实施永久纠正措施
Verify Effectiveness of Action 措施效果验证及追踪
Describe verification results in
措施驗證及追蹤:
1.針對改善后產品,QA進行全檢3批次,如無發現不良,則改善有效,反則,繼續改善.
2.QE追蹤改善后批次客戶端使用情況.